国产精品久久久久久av蜜臀-亚洲色图中文字幕人妻-日韩人妻无码一级毛片水多多-亚洲精品女人成人久久久-亚洲中文字幕在线无码一区二区-欧美老熟妇一区二区三区四区-av电影在线观看网址-巨大欧美黑人xxxxbbbb-国产十日韩十另类十视频新区

Hotline:400-880-1556

English




Plug and socket GB2099 test report processing process——ZRLK

Author:中認(rèn)聯(lián)科 time:2022-06-22 Ctr:1763

GB/T2099 standard applies to indoor or outdoor use, household and similar use, only for alternating current, rated voltage above 50V but not more than 440V, rated current not more than 32A, with or without grounding contact plugs and Fixed or mobile sockets.

Plug and socket GB2099 testing standard

1. GB/T2099.1 Household and similar plugs and sockets - Part 1: General requirements;

2. GB/T2099.2 Household and similar plugs and sockets - Part 2: Particular requirements for appliance sockets;

3. GB/T2099.3 Household and Similar Plugs and Sockets Part 2-5: Special Requirements for Converters;

4. GB/T2099.7 Household and similar plugs and sockets Part 2-7: Special requirements for extension cord sockets.

Plug and socket GB2099 test items

1. Inspection of signs and dimensions;

2. Anti-shock protection and grounding measures;

3. Terminals and ends, the force required to pull out the plug;

4. The structure of the fixed socket, the structure of the plug and the mobile socket;

5. Interlocking socket, anti-aging, protection and moisture-proof provided by the shell;

6. Resistance to abnormal heat, flame resistance and tracking resistance of insulating materials;

7. Insulation resistance and electrical strength, the work of grounding contacts;

8. Temperature rise, breaking capacity, normal operation, flexible cable and its connection;

9. Mechanical strength, heat resistance, screws, current-carrying parts and their connections;

10. Creepage distance, electrical clearance and distance through sealant;

11. Additional test for anti-rust performance, plug with insulating sheath.

Plug and socket GB2099 test report processing process

1. Business consultation: The applicant provides GB2099 plug and socket testing data, pictures and testing requirements to our company;

2. Project quotation: According to the information provided by the applicant, the engineer makes an evaluation and makes an oral quotation to the applicant;

3. Provide information: After the applicant accepts the oral quotation, submit the test sample to our company;

4. Payment: Send a written quotation to the applicant after receiving the sample, and the applicant will arrange payment according to the written quotation;

5. Sample testing: product testing in accordance with applicable standards;

6. Issuing a report: After the test is completed, the laboratory will issue a third-party CNAS test report and close the case.

image.png

Please contact our company ZRLK for the GB2099 test report of the plug and socket. We will provide you with professional and efficient testing and certification services with favorable prices and considerate service. If you provide us with product pictures and specifications, we will give you corresponding cycles, quotations and specific solutions according to your products. You are welcome to inquire!

Related Articles
  • Tablet CE-RoHS Certification: Key to Hazardous Substance Control and Compliance

  • Wireless Microphone SRRC Certification: A Statutory Threshold for Spectrum Compliance

  • All-in-One Machine CCC Certification: A Core Guide to Mandatory Compliance for Market Access

  • UN38.3 Certification for Polymer Batteries: Building a Strong Safety Line for Cross-Border Transportation

Follow Us